Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
More information facilitates better communication.
Submitted successfully!
We will call you back soon!
Leave a Message
We will call you back soon!
Your message must be between 20-3,000 characters!
Please check your E-mail!
Place of Origin: | Shenzhen , China |
---|---|
Brand Name: | CSCE |
Certification: | RoHS/CE/UL/FCC/CE/ISO9001/ISO14001 |
Model Number: | 52F-31880611X01 |
Minimum Order Quantity: | 500pcs |
Price: | Negotiable |
Packaging Details: | Tray in Carton |
Delivery Time: | 7-10 days |
Payment Terms: | L/C, D/A, D/P, T/T, , Western Union, MoneyGram |
Supply Ability: | 150K pcs/day |
Name: | Shielded RJ45 Jack | Rated Voltage: | 125V |
---|---|---|---|
Business Type: | Manufacturer | Rated Current: | 1.5A |
Operating Temperature: | -40℃ To 85℃ | Application: | Ethernet Interface |
High Light: | rj45 female connector,shielded rj45 connector |
180 Degrees Shielded RJ45 Jack / RJ45 Vertical Mount 8 Pin 8 Contact Single Port |
Features :
1. All materials comply with ROHS
2. High-wearing feature
3. OEM & ODM are both available.
4. Quality Assurance, 36 months warranty.
5. Riveting machine was invented by us.
6. We do lots of research and development in these area, if you meet any difficulties, feel free to contact us.
Quick Details:
Specification: | RJ45 Shielded Jack | Cross Part NO: | 52F-31880611X01 |
Mounting: | Thru-hole R/A | Samples: | Available 2-3 Pcs |
Product Description:
Retention Strength | 7.7KG.F MIN Between Jack And Plug |
Contact Material | DiamererI 0.46mm C51000(QSn4-0.3)Phosphor Bronze |
Insulation Resistance | 500 MΩ MIN @ 500V DC. |
Housing Material | PBT/PA66/PA46 |
Mating/Unmating Force | 2.2KG.F MAX. |
Voltage Rating | 125v |
Withstand Voltage | 1000V AC 50Hz or 60Hz,1MIN. |
Operating Life | 750 Cycles MIN. |
Current Rating | 1.5A |
Insert Material | UL94V-0 |
Contact Resistance | 30milliohm Max |
Operation Temperature | ﹣40℃ to +85℃ |
Storage Temperature | ﹣40℃ to +85℃ |
FAQ
*Q: Can I get samples from you?
A: We are honored to offer you samples for quality check.
*Q: What parts are manufactured by you?
A: All of frame parts are manufactured by us.
*Q: What's the leading time? (How long do you need to prepare my goods?)
A: 5 days for sample orders. 15 days for mass production orders (based on different quantities)
*Q: How long do I need to wait before my goods arrive?
A: 3-5 days for international express. 5-7 days for air transportation, 15-30 days for sea transportation.
Product Drawing: